Inverters

Off-grid and hybrid inverter families with feature-coded OmniSol SKUs.

Inverter compatibility map

How buyers should specify inverters before RFQ

Hybrid and off-grid inverters should be matched to grid phase type, PV input, battery voltage, BMS protocol and backup function. A model that looks correct by power rating may still be unsuitable for the target market.

For sourcing, the RFQ should include country, grid standard, phase type, battery family and communication needs before price comparison.

Typical system flow
1PV input
2Inverter MPPT
3Battery BMS
4AC output
5Backup loads
6Monitoring
Selection logic
  • Confirm single-phase, split-phase or three-phase output before selecting the inverter family.
  • Match PV input voltage, MPPT count and battery voltage platform.
  • Check compatible battery protocol, backup mode and monitoring requirements.
  • Confirm certificate, manual, warranty and after-sales support for the destination market.
Buyer risk checks
  • Power rating alone does not confirm battery compatibility or grid approval.
  • Split-phase markets require different output design from standard EU single-phase projects.
  • Backup load expectations should be checked against surge power and transfer logic.
  • Firmware and monitoring support should be discussed before bulk purchase.
RFQ fields to prepare
Power ratingPhase typeGrid voltagePV inputBattery voltageBMS protocolBackup needCountry standard
Send this BOM

48h BOM Review

SKU matching, lead time notes and quotation.

Certificate Check

Standards and document availability reviewed at RFQ stage.

Mixed Container Export

BOS components planned for consolidated shipment.

Inverters components
SPEC REVIEW
Export packing inspection
EXPORT PACKING

BOS Sourcing Support

We help buyers translate a project BOM into compliant, export-ready solar components with clear documentation.

Certificate Review

IEC, EN, UL or market-specific checks.

SKU Matching

Map project specs to available catalog items.

Lead Time Check

Stock, MOQ and production timing notes.

Packing Plan

Carton, pallet and mixed-container planning.

Detailed Specifications

Off-grid, US-standard and split-phase inverter product families for storage RFQ selection.

Buyer FAQ

Inverters sourcing questions

Practical checks buyers usually confirm before quoting, sampling or consolidating a shipment.

Is inverter power rating enough for model selection?

No. Phase type, grid voltage, MPPT input, battery voltage, BMS protocol, backup function and target-country standard also need to match.

Can inverter and battery be quoted as a matched package?

Yes. This is usually safer for storage RFQs because communication, warranty and after-sales responsibility can be reviewed together.

How do buyers request a quote for Inverters?

Send the product list or BOM, quantities, destination country or port, required standards, and target delivery date. OmniSol reviews SKU matching, lead time, packing, and export requirements before quotation.

Can Inverters be shipped with other solar BOS components?

Yes. OmniSol can review mixed-container feasibility for mounting, cables, connectors, protection devices, combiner boxes, distribution boards, and selected storage accessories.

When are certificates and market documents confirmed?

Document availability is checked at RFQ and order confirmation stage against the selected SKU, supplier, model, and target market requirements.