Project proposal · ST5 mixed tables / UndergroundCustomer arrangement update · 2026.09.13

Design work for a project under discussion. The figures below come from our own layout and calculations. They are design values, not readings taken from a running installation.

RIYADH, SAUDI ARABIA

Solar power.
Reliable water.Built around your farm.

Explore your solar pumping system.
From the array and mounting structure to power control and site installation.

OMNISOL GLOBAL / BOS & SYSTEM SOURCING INTEGRATOR
Three ST5 tables with 15, 30 and 30 modules and underground site cabling
Three tables · 15 + 30 + 30 modulesRotate · Explore components · Follow cable routes
01 / SYSTEM VIEW
5systemsIndependent pumping systems
14tablesMounting tables across five systems
390positionsTotal PV modules across five systems
120km/hStructural design target
EXPLORE THE SYSTEM

See how it all connects.

Switch views to explore each part of the system.
The 3D example shows three tables serving one 30 kW pump.

Loading the 3D view...

Single- and double-row arrangement: 15 + 30 + 30 modules, with five independent strings of 15 modules. Site cables run underground; no above-ground cable trays or dedicated tray supports are included. Transparent ground reveals the schematic cable routes. Burial depth, foundations and equipment positions remain subject to detailed installation design.

PROJECT CONFIGURATION

One project.
Five pumping systems.

Single- and double-row ST5 tables support the required array sizes. A 30-module table carries two separate 15-module strings. Each system retains its own DC combiner and control cabinet.

Assembled length of each rail line17.60 mEach rail line is assembled from four 4.40 m lengths. A 15-module table has two rail lines; a 30-module table has four. This is not the total rail quantity per table.
Pump ratingQuantityTables / systemPositions / system
22 kW1260
30 kW2375
37 kW2390
Project total5 systems14 tables390

60 modules: 30 + 30. 75 modules: 15 + 30 + 30. 90 modules: 30 + 30 + 30. With 15 modules per string, the 60-, 75- and 90-module systems have four, five and six strings respectively. The project totals 2 single-row tables plus 12 double-row tables: 14 tables, 26 strings and 390 modules / 253.50 kWp at 650 W. The 3D shows the 75-module example.

WATER, WHEN IT IS NEEDED

Choose how your farm is supplied.

Interactive demonstration only
DAYTIMESolar pumping
◐NIGHTWaiting for sunlight

The maintained selection permits operation to resume the next day. Water-level, temperature and fault protection take priority.

Protection takes priority. Low water, a full tank, faults or overtemperature stop the pump as defined by the control logic. The design uses a 50°C actual upper air-temperature limit at the drive inlet, a red alarm and manual reset after cooling. Continuous operation at 55°C ambient is not specified.

STRUCTURE & MATERIALS

A practical mounting arrangement.

Standard sections and matched module clamps.
Manufacturing drawings define dimensions, holes and assembly details.

Supplier ST5 single- and double-row mounting frames
01
Supplier ST5 · S350GD

C80 × 40 × 10 · t 1.8 mm

Rails and inclined beams follow the supplier drawing. Posts and diagonals: C60 × 40 × 10 × 1.8 mm.

02
Six support frames per table

3,150 mm frame spacing

The restored arrangement shows separate front- and rear-leg bases: 12 foundations per table, or 36 in the three-table example. Base components and anchors are schematic; final details follow the confirmed supplier drawings.

03
Rear bracing and accessories

U21 × 1.5 mm · Standard clamps

Rear X bracing at both end bays. Coating specification and matched module-clamp details follow the final supplier documentation.

Embedded concrete foundations

The original 10 September drawing uses separate front and rear foundations and marks a 200 mm buried portion. It does not specify block length, width or total height. GL 500 mm refers to module clearance above ground, not the concrete block width. The displayed block is schematic; foundation dimensions require a supplier detail.

FROM ARRAY TO PUMP

Follow the power from array to pump.

01

PV array

Positive and negative cables paired by string

02

DC combiner box

75-module example: five string inputs, one output

03

Pump control cabinet

PV/grid transfer and motor drive

04

Submersible pump

Separate motor cable and protective earth

Underground site cables

Array leads descend to underground routes towards the equipment room. Above-ground cable trays, tray lids, band clamps and dedicated tray supports are excluded. Burial depth, cable suitability and any required ducts will be defined with the site installation details.

Protective earthing

The common earth strip is fixed along the outside faces of the end-side metal posts. Five downleads in the 75-module example connect directly to the strip through crimp lugs. The strip, fixings and basic bonding materials are included in the proposed scope; the site earth electrode and site works are separate. Strip section, joints and any restraint between tables remain installation details.

Customer-built equipment room

The customer has confirmed a local room for the DC combiner and pump control cabinet. The open room envelope is illustrative. Building dimensions, ventilation and cable-entry details will be coordinated during detailed design.

ENGINEERING, WITH TRACEABILITY

Engineering behind the proposal.

Engineering documents will be uploaded as their revised versions are completed.
The current 3D proposal is provided for arrangement review and confirmation.

STRUCTURAL LOAD REPORT120km/h

Wind design target

The ST5 structural load report is pending. It will assess the mounting members, connections, anchors and foundations against the confirmed site conditions and design criteria.

PENDING ENGINEERING REVIEW · REPORT TO FOLLOW

Member strength and stability

Pending review

Structural assessment must cover the single- and double-row ST5 mounting arrangement.

Connections and deformation

Pending review

Connection forces, restraint assumptions and deformation limits will be checked in the structural report.

Foundation bearing and stability

Site data required

Final verification will use the confirmed ground level, soil conditions, reinforcement and foundation details.

ST5 structural load report

Pending review

The completed report will be uploaded here after engineering review.

Standards and scope Design reference, not a certificate
SBC 301 / SBC 308 / AISI S100

Loading / Applicable cold-formed steel design basis

Refer to the clauses and applicability conditions actually assessed in the report.

SBC 401 / IEC 62548-1

Electrical installation / PV arrays

Design references for DC wiring, protection, transfer and earthing.

IEC 60364-5-52 / -5-54

Cable selection / Protective earthing

Consider temperature, grouping derating, voltage drop and protective conductors.

IEC 61439

Switchgear assemblies

Conformity requires the applicable product and assembly verification records.

System single-line overviewUpdated edition pending · 75-module example: 5 strings × 15 modules
Power and control circuitsUpdated edition pending · Cabinet interface details follow detailed design
ST5 structural load reportPending engineering review · Single- and double-row arrangement
OMNISOL GLOBAL

A clear proposal.
An informed next step.

System integration · Factory sourcing · Engineering documentation and delivery coordination

Back to the system English project proposal ST5 mixed tables / Underground · Drawings and supply terms follow the final confirmed revision.

Working on something similar?

Every pumping job starts from the same two numbers: how much water, and how far up. Work those out first and the rest of the system follows.

Start an enquiry

Scope. We supply the equipment package: modules, mounting, drive cabinet, cabling, protection and the shipping documents, FOB China through audited partner factories. Drilling, pipework, civil foundations and site installation are not in our scope and stay with the local contractor.